• 1.png
  • 2.png
  • 3.jpg
  • 4.jpg
  • 5.png
  • 6a.png
  • 7.png
  • 8.png
  • 9.png
  • 10.png
  • 11.png
  • 12.JPG
  • 13.png
  • 14.png
  • 15.png
  • 16.png
  • 17.png
  • 18.png

2009 - NZ - Review of VOC-Roughness Relationships

2009 - NZ - Review of VOC-Roughness Relationships

2009 - NZ - Review of VOC-Roughness Relationships

Description

A review was undertaken by to establish whether or not passenger car and truck (HCV-I) vehicle operating cost (VOC) – roughness cost tables and graphs contained in Transfund New Zealand’s Project Evaluation Manual (PEM) are valid for current, New Zealand, operating conditions. This indicated significant overestimation of the maintenance and repair costs.

Published on
26 September 2022
Last Updated Date
31-12-2025
File Size
1.19 MB
File Type
application/pdf
Hits
849 Hits
Download
317 times
×