2001 - New Zealand Vehicle Operating Costs Model - Preparing Congestion Tables
1125 Downloads

The NZVOC Model is used by Transfund New Zealand to prepare tables of vehicle operating costs for their Project Evaluation Manual. Two projects were conducted to update the costs and develop a new version of the NZVOC Model, one in 1999 and a second in 2001-2003. The NZVOC model contains enhanced VOC relationships and formed the basis for the HDM-4 RUE model.
File Name: | 2002_transfund_pem_congestion_tables.pdf |
File Size: | 236.72 KB |
File Type: | application/pdf |
Hits: | 1104 Hits |
Download: | 1125 times |
Created Date: | 25-06-2019 |
Last Updated Date: | 21-03-2018 |