• 1.png
  • 2.png
  • 3.jpg
  • 4.jpg
  • 5.png
  • 6a.png
  • 7.png
  • 8.png
  • 9.png
  • 10.png
  • 11.png
  • 12.JPG
  • 13.png
  • 14.png
  • 15.png

Welcome to Chris Bennett's and Lis Pedersen's web site. If you are looking for information Chris' current work on affordable housing, please visit www.mygbhousing.info. The video below tells the background to Chris' project.

 

2007 - PIARC - Evaluating the Performance of Automated Pavement Cracking Equipment

1846 Downloads

2007 - PIARC - Evaluating the Performance of Automated Pavement Cracking Equipment

The objective of this technical report is to help road administrations choose and select automated systems in regard to their needs, therefore increasing the quality of the crack data used in pavement management systems. The concepts presented in this document are not international standards, only a summary of the experiences exchanged between world experts. set as its principal objectives the development:

 

First, the paper presents a series of more objective and more detailed rules to measure and classify cracks. Some have the objective of increasing the reproducibility of measurements and allowing more reliable comparison of the cracking data gathered by different equipment. A monitored zone has been delimited as well as a better definition of a crack and a methodology to measure the crack severity and extent.

 

Similarly, three methods of evaluation of the reliability of automated crack measuring equipment are also proposed. The research level validation test is used to rate the sensor’s resolution and sensitivity regarding the capability to capture raw pavement data (images or 3D data). The project level validation test allows road administrations to rate the equipment’s bias and repeatability to precisely measure cracks on some small controlled reference track which presents specific and various conditions. While the last validation test, entitled network level validation test, differs from the preceding one by the scope of the measurement campaign and by the precision level sought. Performed on 50-100 km of road, the equipment can be tested on varied surfaces that are more representative of the network reality.

 Prepared by Working Group D of Committee TC 4.2 “Road/Vehicle Interaction” 

File Name: 2007_piarc_evaluating_automated_cracking_equipment.pdf
File Size: 636.84 KB
File Type: application/pdf
Hits: 1056 Hits
Download: 1846 times
Created Date: 25-06-2019
Last Updated Date: 21-03-2018

Adventures

Chris in the NCT Race 

Chris has an adventurous spirit which generally involves cycling, running, or just being out there having a good time. Read his 'Race Reports' below. This is a link to his SPOT GPS tracker. If you are interested in his 'geeky' sport technical blog it is at www.tri-duffer.com. He also has stories of his life as 'An Overtravelled Engineer Working for the World Bank' at World Bank Traveller.

 

Race Reports

Technical

Document Library

 

  • Chris' published papers and reports are here.
  • His Technical Library  has a range of reports 
  • Golden Bay community projects are here.
  • The history of the ROMDAS company is here.
  • The 'Road to Good Health' HIV/AIDs Toolkit is here.

 

Technical Library

Chris and Lis

Chris and Lis

We are Lis Pedersen and Chris Bennett. We’ve been married over 30 years and each found our way to New Zealand in the early 1980s from Denmark and Canada respectively. Golden Bay has been our happy place for almost 20 years and we are now based in Pohara just above the beach, with our two cats Coco and Max. 

 

 

 

Read More